Siroccon were appointed as the Consulting Engineers and Main Contractor for this project.
This project involved a refurbishment of the Casino interior, as well as some of the external facades. Numerous load-bearing walls needed to be demolished and supporting steel structure was installed. Most of the internal finishes and fittings were replaced.